text.skipToContent text.skipToNavigation
01.06.2026 - Sarbatoare Nationala in Romania. Comenzile din 29.05.2026 se vor livra in 03.06.2026, iar cele din 01.06.2026 se vor livra in 04.06.2026.

Pipe pin Spring steel Zinc plated

Article number
Brand Fabory
Material Spring steel
Surface treatment Zinc plated
Info
  • Warning: electroplating of these products may cause hydrogen embrittlement.

Specifications

Brand Fabory
Material Spring steel
Surface treatment Zinc plated
Info
  • Warning: electroplating of these products may cause hydrogen embrittlement.

Products ({0})

  Stock Net price   Sign up
Do not close this page. This message will disappear, when the page is fully loaded.